Reverse auction
Contents |
[edit] Introduction
Reverse auctions occur when suppliers compete for business in an online event by submitting the lowest bid during a specific timeframe. Reverse auctions can either be open or closed/private and are forms of Dutch auctions (also known as open descending-bid auctions where an initial price is set and progressively lowered until a bidder is prepared to accept the amount offered).
The purpose of a reverse auction is to allow business owners or procurement managers to purchase construction services at the lowest price. It does not take into consideration the experience or qualifications of the bidder.
[edit] History
This form of service procurement originated in the US the 1990s as businesses began to incorporate Internet-based methods to increase the speed of their procurement processes. The approach was initially used to purchase items such as office supplies and manufacturing equipment, and services such as tech support. It was not until 2000 that reverse auctions were used construction services in the US by large retailers, pharmaceutical companies and automobile manufacturers.
Reverse auctions were introduced in the UK in the early 2000s when the Office of Government Commerce (OGC) tested it as a procurement method for negotiating contracts for products and services not specifically associated with construction. It became more popular within the government and is still used today.
[edit] Details of reverse auctions
For the project owner, the outcome of a reverse auction will depend several factors:
- Is the marketplace competitive?
- Does the bid include all of the specifics of the project?
- Have contracting firms been properly pre-screened before being permitted to participate in the auction?
- Is there an understanding of how change orders will be handled once the project begins?
Suppliers must consider the following criteria before submitting their bids:
- Will the bid allow them to deliver the results as promised without compromising issues such as safety or timeframe?
- Will the delivery of the project have a negative impact on the outcome of other projects - whether it be profit margin or reputation?
- Will the bid cover the costs of all subcontractors on the project?
- Is there a limit to how low they will bid before walking away from the project?
By treating construction projects as commodities (such as office supplies or manufacturing equipment), the reverse auction process can fail to properly consider external variables such as weather, personnel, site conditions and other so on. This method has generally not been popular within the construction industry.
[edit] Related articles on Designing Buildings Wiki
- Auction theory.
- Best value.
- Bidder.
- Computers in construction tendering.
- Dutch auction.
- Electronic auctions under the Single Procurement Document (Scotland).
- E-procurement.
- E-sourcing.
- Invitation to tender.
- Managing the procurement process.
- Open tendering.
- Procurement route.
- The benefits of e-procurement in construction.
Featured articles and news
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.